Bootstrap 2016-01
(→Topics) |
(→Minutes) |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 38: | Line 38: | ||
= Topics = | = Topics = | ||
<!-- add below here --> | <!-- add below here --> | ||
− | + | * CNC status [[User:Gunstick|Gunstick]] ([[User talk:Gunstick|talk]]) 19:09, 23 January 2016 (CET) | |
− | + | * Server migration status [[User:Gunstick|Gunstick]] ([[User talk:Gunstick|talk]]) 19:09, 23 January 2016 (CET) | |
− | + | * Annual report help [[User:Gunstick|Gunstick]] ([[User talk:Gunstick|talk]]) 19:09, 23 January 2016 (CET) | |
− | + | * General Assembly [[User:Gunstick|Gunstick]] ([[User talk:Gunstick|talk]]) 19:09, 23 January 2016 (CET) | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
= Minutes = | = Minutes = | ||
<!-- to fill out after meeting --> | <!-- to fill out after meeting --> | ||
+ | Meeting starts at 19:12, 7 people are present. | ||
+ | |||
+ | * CNC status | ||
+ | Joe has finished the CNC mill and it's in a working state. | ||
+ | Need to continue documenting the software environment. | ||
+ | https://wiki.hackerspace.lu/wiki/Shapeoko | ||
+ | Gunstick shows the hardware and explains the principles. | ||
+ | |||
+ | * Server migration status | ||
+ | The current server is old and may fail. | ||
+ | Result of vote by office was for hosting a VM at iON. | ||
+ | We would need some people who are good in docker environments to migrate services. | ||
+ | |||
+ | * Annual report help | ||
+ | For the general assembly and for requestion subsied we need contents for an annual report. | ||
+ | Todo: Get all events from the calendar to a list. Get all pictures from our twitter | ||
+ | feeds @syn2cat and @level2. And any other photos which might exist. | ||
+ | |||
+ | * General Assembly | ||
+ | Proposed date is 5th of March at 19:00 | ||
+ | |||
+ | Meeting ends at 19:45 |
Latest revision as of 19:53, 23 January 2016
Bootstrap 2016-01
The syn2cat plenum
| |
---|---|
Type of Event: | Meeting |
From: | 2016/01/23 19:00 |
Till: | 2016/01/23 23:30 |
Recurring: | no |
Organizer: | syn2cat |
Cost: | 0 EUR0 $ 0 £ 0 CHF |
Mandatory registration: |
|
Attendees: | Log-in to RSVP |
Contact Person(s): | Gunstick (mail), Muling (mail), Sid (mail), Steve (mail), defane (mail), rafiot (mail) |
Keywords: | |
Location | |
Where: | Level2 (87, route de Thionville, Luxembourg, Luxembourg) |
Map: |
Loading map...
|
Tools | |
QrCode: | |
Add to your calendar: | Download … further results |
Alternate picture: | None |
Announce globally: | no |
[edit] Introduction
If you would like to discuss something, simply add it below the upcoming event!
The Guidelines page regroups all major decisions taken at prior Bootstrap Meetings.
- Etiquette
- No items can be added to a schedule once the meeting has begun.
- If midnight before meeting, the topics is empty, there will be no meeting. Sorry
- A meeting can't last any longer than 4 hours (a 30min pause will be made after 2h)
- People should sign the topics they added using ~~~~.
- Topics will only be discussed if their authors are present at the meeting.
[edit] Topics
- CNC status Gunstick (talk) 19:09, 23 January 2016 (CET)
- Server migration status Gunstick (talk) 19:09, 23 January 2016 (CET)
- Annual report help Gunstick (talk) 19:09, 23 January 2016 (CET)
- General Assembly Gunstick (talk) 19:09, 23 January 2016 (CET)
[edit] Minutes
Meeting starts at 19:12, 7 people are present.
- CNC status
Joe has finished the CNC mill and it's in a working state. Need to continue documenting the software environment. https://wiki.hackerspace.lu/wiki/Shapeoko Gunstick shows the hardware and explains the principles.
- Server migration status
The current server is old and may fail. Result of vote by office was for hosting a VM at iON. We would need some people who are good in docker environments to migrate services.
- Annual report help
For the general assembly and for requestion subsied we need contents for an annual report. Todo: Get all events from the calendar to a list. Get all pictures from our twitter feeds @syn2cat and @level2. And any other photos which might exist.
- General Assembly
Proposed date is 5th of March at 19:00
Meeting ends at 19:45