Electr-O-Mat

From syn2cat - HackerSpace.lu
(Difference between revisions)
Jump to: navigation, search
(Ideas)
Line 39: Line 39:
  
 
* Out of Office button - everything shuts down automatically.
 
* Out of Office button - everything shuts down automatically.
 +
 +
== Achieved ==
 +
 +
* Power Sockets
 +
** 3 triple power sockets installed in the chill, well done guy(s).
 +
 +
* Fancy Lights
 +
** As u may noticed some blue&green lights were added to the chill room.
 +
 +
* BRS
 +
** Some new toys were added. By entering the chill room u see a remote controller fixed at the right on the cupboard:
 +
[[File:rc.jpg]]
  
 
== Useful Links ==
 
== Useful Links ==
 
* Hager Tehalit [http://www.hager.de/leitungsfuehrung-und-raumanschlusssysteme/bruestungskanalsystem-aus-pvc-br/162247.htm?ref_pageId=162040]
 
* Hager Tehalit [http://www.hager.de/leitungsfuehrung-und-raumanschlusssysteme/bruestungskanalsystem-aus-pvc-br/162247.htm?ref_pageId=162040]
 
* KNX (formerly EIB) Standard [http://en.wikipedia.org/wiki/KNX_%28standard%29]
 
* KNX (formerly EIB) Standard [http://en.wikipedia.org/wiki/KNX_%28standard%29]

Revision as of 21:39, 5 September 2010

Add your Project
Crystal Project package graphics.png
Electr-O-Mat
Pimp my electrical installation in the Hackerspace.
Electricity.gif
Meetings: none
Type: hardware


Status: running
Members: NPU, Gunstick, Sim0n
Contact Person: NPU (mail)
Tools
QrCode: QR-03215640e9d80e1f2b61b8f84368fac1.png


Contents

News

Tasks/Sub-Projects

  • Add some power sockets where it's needed.
    • There are too few power sockets in the cable conduit beneath the windows, especially in the chill room.
  • Add some more fancy lights.
    • Blue, green, yellow, red... we need some more colors in the chill room, and maybe some cool neat illumination in the corridor and WC.
  • Add a single on/off button for all these fancy lights.
    • We are lazy, aren't we? So we need one BRS (Big Red Switch) to turn all this stuff on and off when arriving/leaving the Hackerspace.
  • Add a 5/12/24 V power source.
    • Instead of having a 12V power supply plugged in each 2 meters, we should put one single and powerful 5-12-24 V power supply in each room.

Ideas

  • Power Sockets
    • Some (6) compatible (Tehalit) triple power sockets are already bought by myself. We need to decide where it should be installed first.
  • Fancy Lights
    • Where? Which colors? What type of lights (tube, LED, ...)
  • BRS
    • Maybe with some EIB relays, would be more expensive but at least it's a standard and instructive for each of us.
  • 5-12-24V Power
    • A PC ATX Power Supply should be exactly what we need. Which outlets for the various voltages?
  • Out of Office button - everything shuts down automatically.

Achieved

  • Power Sockets
    • 3 triple power sockets installed in the chill, well done guy(s).
  • Fancy Lights
    • As u may noticed some blue&green lights were added to the chill room.
  • BRS
    • Some new toys were added. By entering the chill room u see a remote controller fixed at the right on the cupboard:

Rc.jpg

Useful Links

  • Hager Tehalit [1]
  • KNX (formerly EIB) Standard [2]
Personal tools
Namespaces

Variants
Actions
Navigation
syn2cat
Hackerspace
Activities
Initiatives
Community
Tools
Tools